Zamonaviy dunyoda ilm-fan va texnologiya 5-jild logy-son (2026) · 19–22-betlar
BLOCK MODELING AND TRADITIONAL CONTROL METHODS INTEGRATION IN SMALL-SCALE DEPOSITS WITH COMPLEX GEOLOGICAL STRUCTURE
Yusupov, Sh.M., Ravshanov, Z.Y., Pardayev, Sh.Sh., Ergasheva, Z.A.
DOI: 10.5281/zenodo.20605271 · Manbada o'qish → · PDF (manba serverida)
Annotatsiya
This article addresses the integration of block modeling and traditional control methods in the extraction of small-scale mineral deposits with complex geological structures. Research findings demonstrate that application of the integrated system increases ore grade estimation accuracy by 23% and reduces operational costs by 18-25%. The methodology was tested at three deposits in the Kyzylkum region of Uzbekistan, providing a robust comparative dataset.
block modeling, control methods, complex geological structure, small-scale deposits, ore grade estimation, integrated system.
Metadata manbasi: jurnal OAI-PMH arxivi · Sindex to'liq matnni saqlamaydi, manbaga havola beradi.