Темир йўл транспорти: долзарб масалалар ва инновациялар Ҷилди 2 (2024) · Саҳифаҳои 18-25

INTEGRATION OF THE GAUGE CONTROL DEVICE ON RAILWAY SECTIONS WITH THE DISPATCHER CENTRALIZATION SYSTEM: INTEGRATION OF THE GAUGE CONTROL DEVICE ON RAILWAY SECTIONS WITH THE DISPATCHER CENTRALIZATION SYSTEM

Курбанов, Жанибек, Хиров, Эркин, Яронова, Наталья

Дар манбаъ хондан PDF

Аннотатсия

This article presents a connection scheme for the gauge control device located on railway sections to the existing dispatcher centralization system. It also describes the process of controlling and monitoring the state of this device by the dispatcher of  the centralized system through the connection scheme. Various communication means such as cable networks or wireless technologies are used to connect the gauge control device on railway sections with the dispatcher centralization system. This ensures real-time data transmission about the state of train gauges. Integration with the dispatcher centralization system automates the movement control process, enhancing the safety and efficiency of railway transport. Such a system allows for rapid response to any changes in the parameters of moving objects.

устройство контрольно-габаритного контроля, диспетчерская централизация, электрическая централизация, поездой диспетчер, дистанционное управление, дистанционный мониторинг, сигнальный импульс, автоматизированное рабочее место, центральный пост, линейный пост.gauge control device, dispatcher centralization, electrical centralization, train dispatcher, remote control, remote monitoring, signal pulse, automated workstation, central post, line post.

Манбаи метамаълумот: бойгонии OAI-PMH-и маҷалла · Sindex матни пурраро нигоҳ намедорад, ба манбаъ пайванд медиҳад.

Иқтибос гирифтан

APA 7
Курбанов, Жанибек, Хиров, Эркин & Яронова, Наталья (2024). INTEGRATION OF THE GAUGE CONTROL DEVICE ON RAILWAY  SECTIONS WITH THE DISPATCHER CENTRALIZATION SYSTEM: INTEGRATION OF THE GAUGE CONTROL DEVICE ON RAILWAY  SECTIONS WITH THE DISPATCHER CENTRALIZATION SYSTEM. Темир йўл транспорти: долзарб масалалар ва инновациялар, 2, 18-25.
GOST R 7.0.5
Курбанов, Жанибек, Хиров, Эркин, Яронова, Наталья INTEGRATION OF THE GAUGE CONTROL DEVICE ON RAILWAY  SECTIONS WITH THE DISPATCHER CENTRALIZATION SYSTEM: INTEGRATION OF THE GAUGE CONTROL DEVICE ON RAILWAY  SECTIONS WITH THE DISPATCHER CENTRALIZATION SYSTEM // Темир йўл транспорти: долзарб масалалар ва инновациялар. 2024. Т. 2. С. 18-25.
BibTeX
@article{жанибек2024,
  author  = {Курбанов, Жанибек and Хиров, Эркин and Яронова, Наталья},
  title   = {INTEGRATION OF THE GAUGE CONTROL DEVICE ON RAILWAY  SECTIONS WITH THE DISPATCHER CENTRALIZATION SYSTEM: INTEGRATION OF THE GAUGE CONTROL DEVICE ON RAILWAY  SECTIONS WITH THE DISPATCHER CENTRALIZATION SYSTEM},
  journal = {Темир йўл транспорти: долзарб масалалар ва инновациялар},
  year    = {2024},
  volume  = {2},
  pages   = {18-25}
}
RIS
TY  - JOUR
AU  - Курбанов, Жанибек
AU  - Хиров, Эркин
AU  - Яронова, Наталья
TI  - INTEGRATION OF THE GAUGE CONTROL DEVICE ON RAILWAY  SECTIONS WITH THE DISPATCHER CENTRALIZATION SYSTEM: INTEGRATION OF THE GAUGE CONTROL DEVICE ON RAILWAY  SECTIONS WITH THE DISPATCHER CENTRALIZATION SYSTEM
JO  - Темир йўл транспорти: долзарб масалалар ва инновациялар
PY  - 2024
VL  - 2
SP  - 18
EP  - 25
ER  -