GRAPH MODELS IN CALCULATING TIME CHARACTERISTICS AND CRITICAL PATH

Asamxodjayeva, Shoira

Булактан окуу PDF

Аннотация

This paper examines graph models used for scheduling a set of interrelated tasks. The focus is on methods for calculating the time characteristics of activities, such as early and late start and finish dates, and determining the critical path of a project - the sequence of activities that determines the minimum duration for completing all work. The construction of a network graph reflecting the logical structure of the project and algorithms for analyzing time parameters based on it are considered. The role of computer technologies in automating calculations and visualizing network models is also emphasized, which contributes to more efficient project and resource management. The work may be useful for students, project management specialists and those interested in methods of planning and optimizing work processes.

Network ScheduleCritical TimeOperationsCritical PathTime ParametersReserve IntervalEvent

Метадайындар булагы: журналдын OAI-PMH архиви · Sindex толук текстти сактабайт, булакка шилтеме берет.

Цитата алуу

APA 7
Asamxodjayeva, Shoira (2025). GRAPH MODELS IN CALCULATING TIME CHARACTERISTICS AND CRITICAL PATH. Яшил иқтисодиёт ва тараққиёт, 3(6), 26-33.
GOST R 7.0.5
Asamxodjayeva, Shoira GRAPH MODELS IN CALCULATING TIME CHARACTERISTICS AND CRITICAL PATH // Яшил иқтисодиёт ва тараққиёт. 2025. Т. 3. № 6. С. 26-33.
BibTeX
@article{shoira2025,
  author  = {Asamxodjayeva, Shoira},
  title   = {GRAPH MODELS IN CALCULATING TIME CHARACTERISTICS AND CRITICAL PATH},
  journal = {Яшил иқтисодиёт ва тараққиёт},
  year    = {2025},
  volume  = {3},
  number  = {6},
  pages   = {26-33}
}
RIS
TY  - JOUR
AU  - Asamxodjayeva, Shoira
TI  - GRAPH MODELS IN CALCULATING TIME CHARACTERISTICS AND CRITICAL PATH
JO  - Яшил иқтисодиёт ва тараққиёт
PY  - 2025
VL  - 3
IS  - 6
SP  - 26
EP  - 33
ER  -